Construction on the Grand Ethiopian Renaissance Dam(GERD) – Africa’s biggest hydropower dam – began based on piecemeal preliminary studies and design documents, with only a very basic analysis of how the project would affect downstream neighbors, according to the 2013 final report by an international panel of experts established to evaluate the scheme. The megadam is being built on the Blue Nile in Ethiopia, near the Sudan border, and has created conflict with Egypt over its downstream impacts; the experts’ study confirms Egypt’s concerns that the project’s impacts could be significant and are not well understood.

The Ethiopian government reported last year that the panel’s report “showed that the Dam offers high benefit for all the three countries and would not cause significant harm on both the lower riparian countries”, while Egypt has repeatedly said the report calls for more analysis of downstream impacts. Because the report was not made public, neither side could be vetted. Egypt has called for mediation if further studies are not allowed; at this writing, Ethiopia had refused, and was continuing with dam construction.

In March 2014, International Rivers received a leaked copy of the report.  The report documents numerous problems with existing analysis and a lack of analysis on a number of critical issues. The panel recommends further investigation into the dam’s hydrological impacts, including on downstream countries’ water supplies and power generation; risks from climate change, and geotechnical issues. The panel recommends “a full transboundary environmental and social impact assessment … conducted jointly by the three countries.”

The 10-member panel included two members from each of the three riparians (Egypt, Ethiopia and Sudan), plus four international experts agreed upon by the governments. A geotechnical expert group was added later. The main panel met for about a year, and had four field visits to the dam site. While the panel’s members were granted access to many key project documents (all of which remain confidential at this time), some key reports were not shared with them, including the critical geotechnical assessments for the main and saddle dams, and project cost-benefit analyses.

One international dam expert who has seen the report states that it shows that construction on the project is proceeding on “an aggressively accelerated schedule” with little room for adjusting key elements of dam design to reduce harm or prevent problems. A number of key studies for the project are described by the panel as being outdated or in process. While references are made to some specific international standards being adhered to, overall, the process described seems chaotic and incomplete. It is also clear that there is precious little oversight on Africa’s largest dam project to date. While the international panel has brought a type of oversight, it may be too little, too late – and with too little teeth; it seems the panel does not have a continuing role in ensuring best practices as construction proceeds.

The panel’s report is almost a year old at this writing, yet its members have been mostly silent since their report was completed (as far as we know, none of the panelists have made public statements about the project). The Egyptian and Ethiopian governments continue the war of words, while at the same time construction on the megadam proceeds, and questions raised by the panel remain unanswered.

Going forward, International Rivers recommends construction on the project be halteduntil all necessary studies recommended by the panel are completed, and a process is in place for ensuring public accountability on the project. Given the panel’s findings, Egypt’s call for mediation in the process is reasonable, and donor governments and international bodies should support such a process.

The following summarizes some of the panel’s key findings and recommendations: